top of page

Project experience

  • 62 projects for contractors, designers and infrastructure owners

  • Rail, power, solar and buildings, from tender to handover

  • Each entry: client, asset, stage and what we delivered

Carbon reporting

POWER SUPPLY AND SUBSTATIONS

CP7 carbon calculations, substation and switchgear renewals (Kent, Sussex, Wessex)

AJMS Consultants (Network Rail)

2024 to 2026, live  ·  Design

  • Embodied carbon calculation and report per site, 50+ sites

  • Carbon reduction plan (civils) for the CP7 safer isolations programme

  • Option assessments, for example renewing a track paralleling hut against a DC module

ORGANISATION

Carbon reporting, Carbon Reduction Plan and Planet Mark certification

Enable Infrastructure (BCM Construction)

2021 to 2024  ·  Annual reporting

  • Annual carbon and social value data submissions for Planet Mark

  • Carbon Reduction Plan to PPN 06/21

  • Carbon analysis and reduction planning

POWER SUPPLY AND RESILIENCE WORKS

Embodied carbon assessments: Ludgate Lines Resilience, Pokesdown, TRU Package 8, Wessex feeders

AJMS Consultants (Network Rail)

2022 to 2025  ·  Design

  • Embodied carbon calculations and reports at detailed design

  • Product carbon data from Environmental Product Declarations

Planning, consents and surveys

SOLAR FARM

Didcot Solar Energy Project

Xela Energy

2026, live  ·  Planning

  • Pre-application review and survey scoping by planning stage

  • Archaeology desk-based assessment, written scheme of investigation and geophysical survey through a specialist

  • Thirteen specialist survey packages scoped, quoted and managed on one fee schedule

SOLAR FARM

Home Farm (Hursley Park) Solar Farm

Xela Energy, via RJ Power

2026  ·  Pre-construction

  • Discharge of planning conditions

  • Archaeological watching brief and written scheme of investigation, conditions 21 to 23

  • Arboricultural method statement, tree protection fencing and root protection supervision

POWER AND GRID CONNECTIONS

Finsbury Park cable route and supply point

RJ Power

2026  ·  Design

  • Desktop environmental study to confirm survey and consent needs

  • Site survey notes for the buried cable route

CIVILS AND EARTHWORKS

Tunbridge Wells West and Paddock Wood ecology

Ash Construction Group (Network Rail; Spa Valley Railway)

2025  ·  Pre-construction

  • Preliminary Ecological Appraisals

  • Statutory Biodiversity Metric assessments

  • Ecology method statement and ecological clerk of works

URBAN TRANSIT

DLR projects: Armada Way access road and three DLR sites

T Loughman & Co (Transport for London)

2023 to 2024  ·  Design and pre-construction

  • Preliminary Ecological Assessments

  • Statutory Biodiversity Metric assessments

  • Badger and activity surveys

  • Dust risk assessment and dust management plan

STATIONS AND BUILDINGS

Kenton station canopy and roof renewals

WSP (Network Rail)

2023  ·  Design

  • Preliminary Ecological Appraisal and Environment and Social Appraisal

  • Nesting bird and invasive weed pre-clearance check

  • Asbestos survey managed

DEPOTS AND POWER SUPPLY

Selhurst depot and Southampton hook switch replacements

RJ Power (Network Rail)

2023  ·  Pre-construction

  • Preliminary Ecological Appraisal, Selhurst depot

  • Ecological Impact Assessment, Southampton

  • Japanese knotweed supervision, Northam

BUILDINGS AND STRUCTURES

Willesden Junction bat survey

Capita (Network Rail)

2022  ·  Pre-construction

  • Bat survey report and mitigation plan

POWER SUPPLY AND SUBSTATIONS

Flood risk assessments for substation and switchgear upgrades

AJMS Consultants (Network Rail)

2020 to 2022  ·  Design

  • Desktop flood risk assessments for essential infrastructure, 13+ sites

  • Kent CP6 DC switchgear sites, Micheldever, Winchester, Waterloo, Ashurst and Shawford

  • Environment Agency data requests and flood level review

BRIDGES AND STRUCTURES

CP6 bridge renewals: Waterloo bridges and Highbury Grove

Capita (Network Rail)

2020 to 2021  ·  Design

  • Preliminary Ecological Appraisals

  • Environment and Social Management Plans and Appraisals

  • Contaminated land risk assessment and carbon management input

POWER AND GRID CONNECTIONS

Bedhampton DNO installation

Rail Power Solutions

2018  ·  Design

  • Ecology survey

  • Environmental appraisal to the Network Rail template

POWER SUPPLY AND SUBSTATIONS

Reading 10-car power supply enhancement

BCS Design (Network Rail)

2015  ·  Design

  • Flood level estimation reports, Whitmoor and Winnersh

  • Noise impact assessments managed, Sunningdale and Emmbrook

POWER AND GRID CONNECTIONS

Charlton area Japanese knotweed survey

Balfour Beatty Rail (Network Rail, Thameslink)

2014 to 2015  ·  Pre-construction

  • Japanese knotweed survey of the cable route

  • Recommendations report

Project environmental management

SIGNALLING AND CONTROL SYSTEMS

Signalling works environmental plans: SALE, Wylye TCAIDS, Wessex reactive batteries and chargers

S&T Cover (Network Rail)

2025  ·  Construction

  • Environment and Social Management Plans for each scheme

  • Survey dates and ecological constraints checked

DEPOTS AND MAINTENANCE FACILITIES

Temple Mills Depot

Amey (Eurostar)

2022 to 2024  ·  Construction

  • Construction Environment and Social Management Plan and site waste management plan

  • Noise and vibration management plan and Section 61 assessment

  • BREEAM review and plan

  • Non-road mobile machinery register, resource efficiency plan and KPI dashboard

SIGNALLING AND CONTROL SYSTEMS

Clapham signalling and SIN141 treadles

Amey (Network Rail)

2024  ·  Construction

  • Construction Environment and Social Management Plans

  • Site waste management plans

SIGNALLING AND CONTROL SYSTEMS

Crediton signage

Amey (Network Rail)

2023  ·  Construction

  • Precautionary method of working for ecology

DEPOTS, LINESIDE CIVILS AND FENCING

Project environmental plans: Soho depot, Great Western and Wales sites, track ancillaries and fencing

Enable Infrastructure / BCM Construction (Network Rail)

2022 to 2024  ·  Construction

  • Environment and Social Management Plans

  • Waste management plans and incident response plans

  • Environment and Social Appraisals and desktop constraint checks

STATIONS

Gillingham station night works

Enable Infrastructure (Network Rail)

2024  ·  Construction

  • Section 61 application and noise calculations

ENERGY SITE CIVILS

Onshore civils project for BP

BCM Construction (BP)

2022  ·  Construction

  • Environment and Social Management Plan for civils works

  • Site environmental risk assessment

POWER SUPPLY AND SUBSTATIONS

Cable doubling feeders at substations

RJ Power (Network Rail)

2022  ·  Construction

  • Environment and Social Management Plan

  • Ecology survey schedule and site surveys

  • Flood risk assessment, Winchester

SCIENCE AND HEALTH BUILDING

UCL Institute of Neurology and Dementia Research Institute

ISG (University College London)

2021  ·  Construction

  • Environment and sustainability consultant on site

  • Environmental tracker and inspections

  • Monthly noise, dust and vibration monitoring reports

TELECOMS AND CABLING

Brighton Mainline FDM cable installation

S&T Cover (Network Rail)

2020  ·  Construction

  • Environment and Social Management Plan and Appraisal

  • Ecology brief and site ecological checklists

MAINLINE UPGRADE AND NEW STATION

West Anglia Mainline and Meridian Water station

VolkerFitzpatrick (Network Rail)

2018 to 2021  ·  Construction

  • Environment and consents project lead

  • 100+ consents identified, obtained and tracked

NEW LINE AND STATION

Barking Riverside Extension

VolkerFitzpatrick (Transport for London)

2019 to 2020  ·  Construction

  • Consents and environmental project lead

  • Consents register

STATION AND FOOTBRIDGE

Feltham station combined scheme

Osborne (Network Rail)

2019  ·  Construction

  • Section 61 application

  • Environmental management plan

  • Water ingress investigation and sampling review

ELECTRIFICATION AND POWER

Anglia Electrification Portfolio

Network Rail

2017 to 2019  ·  Design and construction

  • Environment and consents lead, client side

  • Embodied carbon reduction, biodiversity offsetting and stakeholder communications

ELECTRIFICATION AND POWER

Gospel Oak to Barking Electrification

Network Rail

2014 to 2018  ·  Design and construction

  • Environment and consents project lead

  • Environment and sustainability strategy and management plan

  • Vegetation surveys and council permits

  • Section 61 application, Crouch Hill track works

DEPOTS AND SIDINGS

Norwich Victoria Sidings

CPMS (Abellio Greater Anglia)

2018  ·  Design

  • Design Environmental Management Plan

  • Environmental appraisal and action plan

DEPOTS AND MAINTENANCE FACILITIES

Merseyside depots: Birkenhead North and Kirkdale

BCS Design

2017  ·  Design

  • Environmental appraisals and risk assessments

  • Design Environmental Management Plans

DEPOTS AND MAINTENANCE FACILITIES

Slade Green depot

BCS Design

2016 to 2017  ·  Design

  • Sustainability report

  • Environmental action plan

  • Mass balance calculations at GRIP 5

SIGNALLING AND CONTROL SYSTEMS

Kings Cross ETCS Phase 1 civils

BCS Design (Network Rail)

2016  ·  Design

  • Contractor's Responsible Engineer, environment

DEPOTS AND MAINTENANCE FACILITIES

West Ealing depot

BCS Design

2015 to 2016  ·  Design

  • Sustainable design report

  • Mass balance calculations for BREEAM

  • Environmental appraisal review

STATIONS AND HERITAGE BUILDINGS

Cambridge station ticket hall refurbishment

BCS Design

2015 to 2018  ·  Design

  • Contractor's Responsible Engineer, environment and consents

  • Listed building consent support

LEVEL CROSSINGS AND HIGHWAY INTERFACES

Level crossing renewals: Stroud Valley, Dovey Junction, Knottingley, Peterborough

BCS Design (Network Rail)

2015 to 2016  ·  Design

  • Environmental appraisals and action plans

  • Sustainable design input

DEPOTS AND MAINTENANCE FACILITIES

Thameslink depots and stabling: Brighton, Horsham and Cambridge

BCS Design (Network Rail, Thameslink Programme)

2012 to 2015  ·  Design

  • Contractor's Responsible Engineer, environment, for detailed design

  • Design Environmental Management Plans

  • Sustainable design reports and embodied carbon calculations

  • Thameslink award submissions and case studies

Procurement readiness

INFRASTRUCTURE FRAMEWORK

CP7 Eastern Routes Partnership tender

Amey

2023 to 2024  ·  Tender

  • Environmental sustainability responses, Lots 2a and 3a

  • Sustainability strategy for the bid

INFRASTRUCTURE FRAMEWORKS

Framework tender support: Wales, Southern minor works buildings and civils, Reading feeder

Enable Infrastructure / BCM Construction

2021 to 2023  ·  Tender

  • Sustainability, environmental and social value responses

  • Framework social value plans and evidence

INFRASTRUCTURE FRAMEWORKS

Tender and PQQ support for Network Rail frameworks

S&T Cover

2020 to 2026  ·  Tender

  • SIN119 remedial works, frontline labour, signal power supplies, Wessex reactive signalling, Southern Renewals Enterprise signalling

  • Environment, sustainability and social value responses

  • Risk management, health and wellbeing, waste and travel responses

ORGANISATION

Step-By-Step sustainability and social value programme

S&T Cover; AJMS Consultants

2020 to 2026, live  ·  Annual reporting

  • Annual ESG report and Carbon Reduction Plan

  • Social value policy, evidence and reporting

  • Support on client and tender sustainability requirements

INFRASTRUCTURE FRAMEWORK

CP7 framework tender

Dyer & Butler

2022  ·  Tender

  • Social value and environmental responses for the Network Rail CP7 tender

Management systems and training

ORGANISATION

Authority to Work procedure and competence management

S&T Cover

2026  ·  Operations

  • Authority to Work procedure drafted to Network Rail competence standards

  • Core process summary and competence assessment tool

ORGANISATION

Integrated management system rebuild

S&T Cover and S&T Training

2024 to 2026  ·  Operations

  • ISO 9001, 14001 and 45001 system rebuilt into a lean, usable set of documents

  • Registers, trackers and forms moved onto SharePoint

  • Internal audit templates and standards guidance

ORGANISATION

Environmental management system review

Motion Rail

2024 to 2025  ·  Operations

  • ISO 14001 gap analysis and report

  • Aspects and impacts assessment and register

  • ESG policy, objectives and targets

  • Environmental, waste and social management plan; incident response plan

DESIGN TEAMS

Biodiversity accounting in design: CPD course

AJMS Consultants

2021  ·  Training

  • CPD training for design engineers on biodiversity accounting and offsetting

bottom of page